Project Outline:
The project comprised surveying all BA
hangars and compiling a list of non compliant
equipment fixed and portable
electrical equipment together with the design
of new sub-mains control panels. TSA also
worked closely with BA Engineering to optimise
numbers and locations of sockets to reduce
hazards introduced by trailing leads. TSA
developed a cost plan used to estimate the
project value.