PROJECT |
DESCRIPTION |
|
|
|
LES Terminal 5 |
Design of 11kV permanent distribution network for the T5 campus. |
|
|
BBC |
Setting
up Property procedures to control Contractors & work activities: |
|
|
Angels the Costumiers |
16,000
m2 refurbishment: 4,000 m2 Office Block with 12,000 m2
Warehouse behind. |
|
|
HSBC 8 Canada Square Asset Survey |
Canary Wharf: Asset condition survey, bar-coding, fabric condition, setting up maintenance regimes for all services, condition monitoring, thermal imaging, vibration monitoring, commissioning checks, plant performance report. Data transfer to Maximo |
|
|
Harrow Central Mosque |
M&E design of MEPH & lift services for new Mosque in Harrow |
|
|
30 Gresham Street |
City Bank & Dealing Centre - conversion of Trade Contractors' Record Information & Drawings into comprehensive web-based product |
|
|
Steel House |
Design of electrical services, production of design, working and as-installed drawings, site witnessing and commissioning, production of O&M Manual. Office Fit-out. Lighting upgrade to LG3:2001 and decorative lighting, small power services, New LV Switchpanel, Fire Alarms, Public Address, PFC, power supplies to Mechanical plant |
|
|
Rusper Court |
Full
design duties – Mechanical, Electrical & Planning Supervision. |
|
|
Huxley House |
Full design duties, Feasibility Report, Design of mechanical services, production of tender package, tendering of building refurbishment . |
|
|
Thaxted House |
Design
of new high efficiency boiler plant , plus heating to 96 Flats. |
|
|
BRE Energy |
Ongoing energy surveys on behalf of the Government / Action Energy / Carbon Trust |
|
|
Circle 33 FET Audit |
Contract management and auditing the ongoing Periodic Inspection programme including cost control of the testing and remedials budgets on behalf of Circle 33. TSA also provide quality and compliance checking |
|
|
St George's School, Markham Heating |
LTHW Heating replacement – 4 year phased programme |
|
|
Harvey Nichols Knightsbridge |
Design / Management of basement refurbishment |
|
|
TVC Boiler house |
Production of full operational SOPs and record information for BBC TVC central Boiler house comprising 2no 5.5MW gas turbine CHP plus HRSG waste heat boiler & steam fired absorption chillers |
|
|
Ealing Asset Surveys |
Asset survey of c200 properties |
|
|
TVC Plantroom Remedial Works |
Access platforms and gantries to facilitate safe access for maintenance within basement plantrooms |
|
|
Norwich Union Risk Assessments |
Business-related Risk Assessment survey for critical areas on the NU property portfolio in Norwich, Sheffield, Perth and York summating to a floor area of ~143,000 m2 to review the power, cooling, maintenance and monitoring; produce risk assessments and provide recommendations for modification to system design, monitoring methods and maintenance regimes |
|
|
Eyre Court |
Pipe corrosion analysis and proposed phasing of pipework installation |
|
|
11 Strand Sick Building Syndrome |
Site testing of airflow rates, micro-biological analysis, Air Quality measurements of CO, CO2, & particulates, staff questionnaire, water quality analysis, PPM review, ergonomics, and report |
|
|
Horniman Museum |
M&E design of museum gallery refurbishment |
|
|
Bayside Dubai |
Survey re handover inspection & defects |
|
|
Newington Estate |
Central Boiler House boiler replacement and district heating mains pipework upgrade to major housing estate near Elephant & Castle |
|
|
Belgrave Square |
Expert Witness report for heating court case |
|
|
British Embassy Warsaw |
Defects inspection, snagging & asset barcoding / data gathering for new British Embassy Warsaw |
|
|
Wood Street TM44 |
TM44 Air Conditioning Inspection survey & report |
|
|
120 Fleet St |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Daniel House |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Peters Hill |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Procession House |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
LODC |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
British Airways Property |
Technical support role to BA Property on all services issues |
|
|
Waterside Closets |
TEC room cooling design |
|
|
British Airways CE IMCC Relocation |
M&E services support for relocation |
|
|
Thames House |
Redlaw VAV units - office refurbishment & testing |
|
|
South Bucks Council Offices |
Design of the electrical services associated with the rewire of their Slough Council offices. TSA duties included detailed site survey, production of existing record drawings, production of tender package comprising drawings and specification, project planning and programming, tender appraisals, site testing. |
|
|
West Base Heating |
2no 3MW HTHW Viessmann Boilers replacing BAA HTHW supply |
|
|
East Base Heating |
2no 5MW HTHW Viessmann Boilers replacing BAA HTHW supply |
|
|
Boadicea Data Centre |
Change from DX R22 down flow AC units to water-based economiser units incorporating free-cooling facility including feasibility design, option appraisal, business case development, cost benefit analysis, project engineering etc |
|
|
British Airways New World Cargo Load Profile |
Survey, monitoring, analysis and future prediction of electrical load profile |
|
|
St George's PPM |
Maintenance contract |
|
|
Energy Surveys ENERGY
SURVEYS (<2007): |
Alan
Child House & Hambledon House MLS
Business Centres |
|
|
Astral Towers - Survey |
Energy analysis of low energy lighting (11 W/m2) and air conditioning options re improved internal environmental conditions by free cooling maximisation. Development of business case including option appraisal, cost and benefit analysis |
|
|
BBC Authorising Engineer Duties |
Production of and implementing new Safe Systems of Work including: Permit to Work Procedures, Electrical Safety Rules, Mechanical Safety Rules, and Confined Spaces Safety Rules. Co-ordination and management of the introduction of the new procedures throughout the respective portfolios and providing an ongoing audit service to ensure continuing compliance. Assistance in the introduction of an electronic Permit to Work system including writing the operating procedures and for training |
|
|
Riverhouse, Shalford |
VRV system refurbishment and ventilation design changes to suit office relocation |
|
|
BBC Audits |
Audits of Safe System of Work |
|
|
Thames Water Brixton Pumping Station |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Thames Water Honor Oak Pumping Station |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Edgware Community Hospital |
Design of the electrical services associated with the replacement of an existing feeder pillar. TSA duties included detailed site survey, production of tender package comprising drawings and specification, project planning and programming, tender appraisals, site witnessing. Project programming was a vital element as it was necessary to maintain electrical supplies to the hospital with minimal downtime |
|
|
Atrium Court |
Survey and investigation into existing cooling problems |
|
|
Television Centre Basement & HV |
Survey and production of layouts and single line diagrams for all HV/LV sub-stations at BBC TVC |
|
|
Cavendish Gardens |
Expert witness services on electrical testing |
|
|
Moore London |
Full electronic record information, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Wartsila Propulsion UK |
Cooling design for Industrial Unit. |
|
|
Finance House |
M&E condition survey |
|
|
WACCS Training Manual |
Production of user manual for electronic permit to work system |
|
|
Friars House |
5th & 6th Floor refurbishment, VRV plus ventilation, & data communications |
|
|
Hardyng House |
Design of electrical services for rewire of flats |
|
|
Circle 33 Orleston Mews |
Technical assistance in the location and rectification of external lighting faults |
|
|
St Johns Therapy Centre Decant |
Design of electrical services |
|
|
Cylink |
End of dilapidation survey plus full testing of M&E services incl duct cleaning & remedial works |
|
|
GMC Regents Place |
CAD work |
|
|
51 Mayes Road |
Gas compliance investigation and report |
|
|
Old Thai House Restaurant |
Investigation of high electricity bills due to incorrectly wired meters |
|
|
Interserve Healthcare Asset Surveys |
Asset barcoding, surveying & data gathering |
|
|
Interserve Hanslope Park Survey |
Defects inspection & report on problems being experienced at new Data Centre for Foreign Commonwealth Office |
|
|
30 Fallowfield |
Fault investigation re HWS pressures and showers using boosted un-vented HWS |
|
|
St George's School, Markham 2 |
LTHW
Heating replacement - 2nd Floor West Dormitories |
|
|
Bentinck Close |
Pipe corrosion analysis and proposed phasing of pipework installation |
|
|
UK House |
M&E services condition survey |
|
|
Southall Nursing Home |
HWS investigation and replacement strategy |
|
|
Universal Music MECH |
Board room and office air conditioning design |
|
|
TVC Plantroom H&S Survey |
Plantroom surveys and risk assessment associated with safe access for maintenance and H&S statutory compliance |
|
|
TVC Water Quality Review |
Review of water quality control & Legionella procedures for all tanks and cooling towers |
|
|
Merit House |
MEPH survey and end of lease dilapidations |
|
|
Talbot Road |
Expert Witness Report re smell transfer between flats |
|
|
TVC PPM Audit |
Audit of maintenance activities at BBC TVC |
|
|
DVLA AE Duties |
Assessment, interviews and appointment of Authorising Engineers |
|
|
TVC Asset Survey |
Asset survey & database verification for Maximo CAFM system |
|
|
Continuity House |
MEPH survey and end of lease dilapidations |
|
|
Isleworth Town School |
Building regulations compliance report |
|
|
Warner Estates Rewire |
Full Contract Management, cost control and quality control for the rewiring programme for some 200 properties to bring them up to Decent Homes Standards |
|
|
Salesian College |
Boiler
house installation incl HWS calorifier |
|
|
DVLA Ladder / Confined Spaces Survey |
Ladder compliance survey |
|
|
Dombey Street |
Design of heating system for listed flat including planning application |
|
|
NU Occupancy Studies |
Survey and analysis of maximum building occupancy limits |
|
|
Thaxted House - Electrical |
Monitoring of electrical load to calculate available spare capacity |
|
|
Corsica Street |
Lighting design |
|
|
Queens Court Heating |
Heat loss calculation and heating proposal |
|
|
Clerkenwell Court Storage Heaters |
Heat loss calculation and heating proposal |
|
|
Tanshire Holdings |
Schedule of Dilapidations |
|
|
DVLA Incident Investigation |
Incident investigation |
|
|
Danetre Hospital |
Investigation into glass canopy panel failures |
|
|
Brixton & Streatham Leisure Centres |
Schedule
of Dilapidations |
|
|
Circle Anglia Boiler Inspections |
Boiler installation audits - ongoing programme of inspections |
|
|
Tyers Estate |
Design of replacement CWS system |
|
|
Isleworth & Syon School |
Food Tech extension & kitchen refurbishment |
|
|
Chapter House |
Overview of M&E design & installation |
|
|
Interserve Confined Space Management |
Producing Confined Space Registers for 2 large Shopping Centres |
|
|
Alexandra Infant School |
Cooling & ventilation design |
|
Terminal 1 Fire Voids |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Cranebank Data Centre |
New Data Centre design review, support, witnessing. N+1 resilience, low speed low energy fans, Star ammonia thermosyphon chillers, etc |
|
|
Chiller Replacements |
Replacement of existing R11 & R12 Centrifugal chillers with 6 large chiller packages using ammonia refrigerant with adiabatic condensers |
|
|
Amiri Flight |
Survey , testing & remedial works associated with VAV system serving HQ Building in Abu Dhabi |
|
|
Cellnet |
New Data Centre design. N+1 resilience, Liebert downflow units, offices etc |
|
|
Dong Ah Construction ind. Co. Ltd |
Water pumping Station power supplies |
|
|
Eaton Williams AHU |
Marketing & product development |
|
|
Compass Centre |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Eaton Williams FCUs |
Marketing & product development |
|
|
Amiri Flight 2nd |
Survey , testing & remedial works associated with VAV system serving HQ Building in Abu Dhabi |
|
|
Eaton Williams Chillers |
Marketing & product development |
|
|
Amiri Flight extras |
Survey , testing & remedial works associated with VAV system serving HQ Building in Abu Dhabi |
|
|
Astral Towers |
Underground
pipework renewal between building and Energy Centre. |
|
|
Hangar Sockets |
Upgrade and refurbishment of 400 Hz power supplies, & hazardous area compliance |
|
|
Ringiskiddy Tablet Facility |
Fault investigation of the new GMP facility including site testing, snagging, desiccant wheel psychrometry, report recommendations and re-inspections. |
|
|
Cranebank C 4th & 5th |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Cell 4 Cranebank |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Discovery Place |
Design of Mechanical & Electrical services and production of coordinated working drawings |
|
|
Discovery Place (EXTRAS) |
Client changes - design / drawings |
|
|
Cranebank Data Centre - Electrical |
Electrical interlocking design |
|
|
Terminal 4 Stand Lighting |
Report on lighting levels at Heathrow aircraft stands |
|
|
Iceberg |
Review of third party consultant design |
|
|
British Airways SSW Survey |
Review and audit of Safe System of Work, Permit to Work, managing Contractors etc |
|
|
BBC Time-Based Fees |
Various duties |
|
|
Cell 1 Cranebank |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Boadicea House Electrical |
Design of extension to existing data centre switchpanel |
|
|
Compass Centre Emergency Lighting |
Emergency Lighting Refurbishment. |
|
|
British Airways Purchasing SOPs |
Development of standard procedures to obtain best value and standardisation in the procurement of M&E equipment |
|
|
Pit Stop Ticket Booths T4 |
Design of M&E services for ticket & baggage booths |
|
|
Terminal 4 Baggage Lighting |
Report on lighting levels at Heathrow T4 baggage chutes |
|
|
Hangar Sockets - Extra Work |
Additional duties |
|
|
Computer Room Specification |
Production of standard M&E computer room specification |
|
|
Computer Room Surveys |
Survey of computer rooms to check compliance with standard specification |
|
|
United Biscuits Hayes |
Design of electrical services, production of design, working and as-installed drawings, site witnessing and commissioning, production of O&M Manual. Office Fit-out. Cat 2 and decorative Lighting, under floor bus bar, Computer Room services, UPS, power supplies to Mechanical plant |
|
|
Cell 5 Cranebank |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Victory House |
8,000
m2 Spec. Office Refurbishment. |
|
|
Banco Santander |
Office
Refurbishment at 5th Floor. |
|
|
Alpha Electrical Design Services |
Design of electrical services for a number of projects and general technical support |
|
|
Trafalgar Square |
Detailed design of electrical services |
|
|
Boadicea House Pulse |
Electronic record information, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
British Airways New World Cargo PFC |
Analysis, review and recommendations on the use of PFC |
|
|
Hangar Electrics |
Additional duties |
|
|
120 Fleet St Trade Contractors |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Gillette Boilers |
Comprehensive load and cost analysis for summer boiler replacement. Phased replacement specification contract management and testing. Low NOx HTHW boiler replacement |
|
|
GSK - Technical/Project Support |
Ongoing technical support services including general advice, third party consultant design reviews |
|
|
Fountain Court Oxford |
Review of ventilation systems and air conditioning systems |
|
|
Gillette 2nd Floor Walkway |
Design of electrical services for corridor |
|
|
GSK - Generic Electrical Project |
Development of generic electrical project schematics and SLD |
|
|
Extras to TVC Boilerhouse |
Additional duties |
|
|
Extras to TVC Basement |
Extension of survey work to include other areas |
|
|
|
Circle 33 FET |
Contract management and auditing the ongoing Periodic Inspection programme including cost control of the testing and remedials budgets on behalf of Circle 33. TSA also provide quality and compliance checking |
|
Friars House Data |
5th & 6th Floor refurbishment - data communications coordination |
|
|
GSK Electrical Equipment Selection |
Technical assistance to GSK for the global procurement of electrical products |
|
|
OPS Room |
Energy survey, benchmarking & recommendations |
|
|
St James School |
Energy survey, benchmarking & recommendations |
|
|
Circle 33 Warner Properties |
Contract management of electrical upgrade programme |
|
|
Finchley Memorial Hospital |
Energy survey, data analysis, benchmarking & report |
|
|
Torrington Park Health Centre |
Energy survey, data analysis, benchmarking & report |
|
|
Watling Clinic |
Energy survey, data analysis, benchmarking & report |
|
|
Alton Community Hospital |
Energy survey, data analysis, benchmarking & report |
|
|
North Hants Hospital |
Energy survey, data analysis, benchmarking & report |
|
|
Parklands |
Energy survey, data analysis, benchmarking & report |
|
|
Chase Hospital |
Energy survey, data analysis, benchmarking & report |
|
|
Alan Child House & Hambledon House |
Energy survey, data analysis, benchmarking & report |
|
|
TVC Pulse |
Energy Centre and basement plantrooms - electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc - |
|
|
PRIME Contract PPM Review |
Compliance, H&S, PPM & Energy Surveys of Prime Estate (ongoing contract of ~100 buildings/ annum) |
|
|
St George's School, Markham 3 |
LTHW
Heating replacement - Gd West Accommodation |
|
|
Universal Music |
Design of electrical services, production of design, working and as-installed drawings, site witnessing and commissioning, production of O&M Manual. Office Fit-out. Lighting upgrade to LG3:2001 and decorative lighting, small power services, New LV Switchpanel, Fire Alarms, Public Address, PFC, power supplies to Mechanical plant |
|
|
Southwark Water Pressures |
Water pressure measurement, analysis & recommendations regarding Thames water pressure reductions serving 20 estates (260 tower Blocks / houses) |
|
|
|
Circle 33 Lift Contract CDM |
Planning supervisor duties for lift refurbishment contract |
|
Melbury Court |
Pipe corrosion analysis and proposed phasing of pipework installation |
|
|
Heathland School Hounslow |
BMS controls upgrade, plus balancing, flushing & commissioning of all LTHW, & CHW systems |
|
|
Priory Court Estate Lighting |
Design of estate lighting |
|
|
Farnborough Hill |
Legionella assessment and tank replacement contract |
|
|
GSK Agbara Factory Nigeria |
Site survey, production of record drawings, investigation into a number of electrical problems, load analysis, design strategy recommendations, auditing of third party consultant designs |
|
|
Toyota Woodford |
Energy survey, data analysis, benchmarking & report |
|
|
Regency Hotel |
Energy survey, data analysis, benchmarking & report |
|
|
Orchard Infant School |
BMS controls upgrade, control valve replacement, use of Frese pre-set commissioning valves & commissioning |
|
|
Wigmore Place Car Park Lighting |
Report and design of lighting scheme for underground car park |
|
|
Norwich Union PPM/H&S Audits |
Compliance, H&S, PPM & Energy Surveys |
|
|
DVLA PPM/H&S Audits |
Compliance, H&S, PPM & Energy Surveys |
|
|
CircleAnglia Estate Lighting |
Design and contract management of estate lighting upgrade budget for various estates |
|
|
CircleAnglia Contract Procedures |
Production
of specifications and contract documents for various term maintenance
contracts including: |
|
|
MLS Business Centres |
Energy survey, data analysis, benchmarking & report |
|
|
Gresham Street (Pulse) |
3-monthly records maintenance, updates & ongoing management |
|
|
DVLA Swansea Risk Assessments |
Business-related Risk Assessment survey for critical areas on the DVLA property portfolio in Swansea summating to a floor area of ~146,000 m2 to review the power, cooling, maintenance and monitoring; produce risk assessments and provide recommendations for modification to system design, monitoring methods and maintenance regimes |
|
|
Bath Road Slough |
M&E condition survey |
|
|
LS Offices & Shopping Centre Audits |
Compliance, H&S, PPM & Energy Surveys on offices and shopping centre |
|
|
St George's School, Markham 4 |
LTHW
Heating replacement - Boiler House refurbishment |
|
|
Winchester Bowls Club |
Bowling Club heating & lighting upgrade |
|
|
East Lindsey Council |
Energy surveys of 6 council properties and sports facilities including swimming pools |
|
|
CircleAnglia Fire Alarm Contract |
Design and contract management of fire alarm upgrade budget for various estates |
|
|
Rumshott Estate |
Energy survey, data analysis, benchmarking & report |
|
|
25 Cophall Avenue |
Production of electrical record drawings |
|
|
BBC AE Duties - JCI |
Assessment, interviews and appointment of Authorising Engineers |
|
|
Merchant Taylors |
Energy survey of historic building |
|
|
22-25 Leinster Square |
M&E design for 76 room hotel design c/w fully condensing boilers, plate heat exchange HWS system and VRV heat pump air conditioning plus all public health facilities, lighting, small power etc |
|
|
American School Thorpe |
Energy survey, data analysis, benchmarking & report |
|
|
Viceroy Court |
Boiler house survey, CAD drawing, valve labelling & schematic |
|
|
FTP 2007 - RW1 Communal Lighting |
Design of estate lighting |
|
|
Albrighton Community Centre |
M&E design for refurbishment / re-construction of existing community centre including heating, boiler plant, ventilation, heat recovery, BMS, controls, Lighting, power, data services, solar HWS Pre-heat (Hoval SolKit), ventilation plant, etc. |
|
|
Pentire Hotel |
Energy survey, data analysis, benchmarking & report |
|
|
LST Commercial Offices Surveys |
Compliance / PPM surveys |
|
|
File Renaming |
Admin function to re-name certificate file names to agreed convention |
|
|
Worlds End PIR Auditing |
Site checks and auditing of electrical test certificates |
|
|
LST Commercial Estate PM |
Review of caretaker maintenance regimes and production of guidelines and remedials specifications |
|
|
Fairlight Hall |
Design of electrical external distribution for country house |
|
|
LST PAT Inspections |
Detailed review of portable appliance contract and testing |
|
|
Circle Anglia Cope House |
Design of lighting and fire alarms for residential care property |
|
|
New Cross Gate |
production of record drawings for show flat |
|
|
St George's School, Markham 5 |
LTHW
Heating replacement - Remaining zones: |
|
|
GSK Poznan Poland |
Review of third party deign deliverables for electrical upgrade to pharmaceutical facility |
|
|
Circle Anglia Aston Court |
Survey and report on faulty door entry system |
|
|
LST NU Perth |
Investigation into a number of electrical problems |
|
|
Circle Anglia Reactives |
Contract management of remedial works |
|
|
GSK Data Centres USA |
Review of third party deign deliverables for electrical services to new data centres |
|
|
GSK Fire Strategy |
Clean Room Fire Strategy procedures for HVAC systems |
|
|
GSK Transformer Failures |
Technical support for the investigation into a number of transformer failures |
|
|
Pitfield Theatre |
Survey report and feasibility design |
|
|
Carlton Lodge |
Tank replacement + heating system conversion to sealed system |
|
|
Marks & Spencer Ealing |
Surveys and working drawings for M&S Ealing refurbishment |
|
|
26 Leinster Square |
M&E design for 50 room hotel design c/w fully condensing boilers, plate heat exchange HWS system and VRV heat pump air conditioning plus all public health facilities, lighting power, fire alarms etc |
|
|
Bauer Publishing |
Energy survey, data analysis, benchmarking & report |
|
|
Cope House - Fire |
Design of fire alarm system |
|
|
Pension Site Resilience Study |
Survey & resilience studies re main Government UK Operational Pension Sites |
|
|
Christchurch House |
Boiler House replacement |
|
|
Alexandra School Hounslow |
Ventilation & comfort cooling design for School |
|
|
DVLA PIN Rectification Plan |
H&S verification |
|
|
Staffordshire Childrens Home |
Survey & defects report and monitoring on three childrens homes |
|
|
Sense Beauty Salon |
Load calculation |
|
|
Old Tree Court |
Investigation into air conditioning problems |
|
|
Bromley Healthcare |
Investigation into pipework leak problems |
|
|
Hereford Hospital |
Investigation into cubicle panel deterioration |
|
|
NUPPP Surveys |
Building surveys |
|
|
Interserve AE Duties |
Authorising Engineer duties including Authorised Persons assessments |
|
|
Eastbury School |
GS Heat Pump based feasibility options |
|
|
Certificate Schedule |
Developing certificate schedule for use by clients document management system |
|
|
Roddon Rewiring Inspections |
Electrical re-wire / audit inspections / management |
|
|
45 Lockwood Place |
|
|
|
GlaxoSmithKline |
Electrical support, standards & review |
|
|
Peterborough Court |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Climate Change British Airways |
Carbon Trading proposals and emission targets |
|
|
Infonet |
British Airways Property Infonet 2001. Contains all Health, Safety & Environmental procedures |
|
|
Restack Projects |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
BBC UPS Surveys |
Detailed site survey of essential loads including production of single line diagrams and distribution board charts |
|
|
BBC UPS Fault Investigations |
Lead consultant in the investigation into failure of a UPS |
|
|
BBC Static Switch Report |
Investigation and market analysis of the use and application of static transfer switches |
|
|
Compass Entrance Heating |
Survey and investigation into crew report entrance area |
|
|
GlaxoSmithKline - Design Guides |
Production of worldwide electrical design guides |
|
|
BBC PAT Instruction Sheet |
Production of standard technical guidelines for portable appliance testing |
|
|
Circle 33 - Fixed Fee Work |
Ongoing technical support services |
|
|
Water-Source Heat Pumps |
Market research on ground source heat pumps for domestic and small industrial, retail & office units |
|
|
Octagon UPS Investigation |
Investigation into UPS failure including grading study |
|
|
White City 2 Authorisation |
Assessment, interviews and appointment of Authorising Engineers |
|
|
Chertsey Road Woking |
MEPH survey and end of lease dilapidations |
|
|
SolaTube |
Part L compliance review |
|
|
Park Royal Acton |
Training centre heating & AC design including gas provisions to specialist gas testing laboratories |
|
|
St George's School, Markham Energy |
Energy survey, data analysis, benchmarking & report |
|
|
St George's School, 3rd Year Showers |
Shower upgrade |
|
|
Heathrow Queens |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Ocean Print |
Cooling advice re printing process |
|
|
Heathrow T3 Baggage Accommodation |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Heathrow T1 Pier 4 & Victor Stands |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
Event Log |
Development of Access database running behind our Pulse electronic record system to monitor changes to the record information system |
|
|
Langstone Technology Park Bdg 1000 |
CDM Planning Supervision duties for warehouse refurbishment |
|
|
Centrica Northampton |
Training centre heating & AC design including gas provisions to specialist gas testing laboratories |
|
|
BBC Statutory Information |
Technical support |
|
|
Nations House - Second Floor |
Lighting design |
|
|
21 Cranbourne Drive |
Fault investigation re HWS pressures and showers using boosted un-vented HWS |
|
|
Circle 33 Islington Estates |
Technical support to rewiring contract |
|
|
Stafford House Aldershot |
Design of electrical services to apartment block |
|
|
Norwich Union AE Duties |
Assessment, interviews and appointment of Authorising Engineers |
|
|
United Biscuits West Drayton |
8,000
m2 Office Fitout. |
|
|
Circle 33 Water Pressures |
Data logging of water pressures over a 7 day period and recommendations re boosting and storage |
|
|
140 London Wall AE Duties |
Assessment, interviews and appointment of Authorising Engineers |
|
|
Norwich Union Incident Investigation |
Investigation at various sites into a number of electrical incidents |
|
|
NHH CHP Study |
Energy analysis and CHP appraisal |
|
|
British Airways World Cargo Perishables |
Full electronic record information c/w search engine, drawings, Safety File, manufacturers' information, commissioning data etc |
|
|
BBC BH Mimic Panel |
Design of mimic diagram for electrical distribution |
|
|
Battersby Ironsides Sports Club |
Energy advice on heating and lighting |
|
|
Ashwell Farm Shop |
Energy advice on refrigeration and lighting |
|
|
Radford House Fire Risk Assessment |
Contract management of fire risk assessment |
|
|
Francis House 3rd Floor |
Conceptual design work for Channel 4 TV |
|
|
Met Office Cable Sizing |
Cable sizing |
|
|
Gresham Street TM44 |
TM44 Air Conditioning Inspection survey & report |
|
|
Trillium CAE & WACCS |
CAE duties |
|
|
Circle 33 Faraday House & Ferry Street |
Design of estate lighting |
|
|
|
|
|